Today we also had the plasterboard put on the walls using the dot and dab method.
Note that all the plumbing was replaced after these photos were taken – it was all done properly by a proper plumber.
Outside light installed
We also had an additional outside light wired up so the back is symmetrical.
It is look pretty good now. And the rain proved that it is all waterproof.
Oh, the radiator arrived today too. One big meaty one to heat the whole room from behind a sofa.
Outside tap plumbed in. UPDATE: My plumber removed all of this and re-plumbed the tap so it goes out through the kitchen wall, and not under the extension!
UPDATE: the water pipe was removed completely
Light switch for the room
Electric cables down this gap, soon to be covered in slurry, insulation and screed
Old extractor fan outlet and light cables
move
move
Tap now outside where it belongs.
UPDATE – the tap is now around the corner, moved by my plumber
No idea what these numbers mean!
Various items keeping the plasterboard in place