Trenches filled with the concrete foundation

Day 5: Foundations Completed – Trenches Filled With Concrete

Cement Lorry Arrived

Cement Lorry Arrived


Day 5 was a major day. The pipes were boxed in and the trench tidied a little. At around 11.30am the cement arrived and the 3 builders started wheelbarrowing it from the road to the trenches at the back. The lorry ran out of cement and they then had to wait for a new load which fortunately came a couple of hours later. Then the foundation trenches were filled and everything tidied up for the weekend.

Some Photos (ok, all of them):

Photos are not in the right order, don’t ask why, it’s too late on a Friday to care!

Looking at the back of the house for the last time ....

Looking at the back of the house for the last time ….

Ready to build!

Ready to build!

2013-07-19 16.27.12

The 2nd lorry load

The 2nd lorry load

2013-07-19 11.40.40

First barrels of cement go in to the foundation trench

2013-07-19 12.25.15 2013-07-19 14.27.40 2013-07-19 15.18.37 2013-07-19 16.22.20 2013-07-19 16.22.23 2013-07-19 16.22.31 2013-07-19 16.23.59 2013-07-19 16.24.03 2013-07-19 16.24.11 2013-07-19 16.24.18 2013-07-19 16.24.26 2013-07-19 16.24.40 2013-07-19 16.25.11 2013-07-19 16.25.17

Cement Lorry Arrived

The First Cement Lorry – why is this photo last?