Toilet, Landing Cupboard, Doors Fitted, Bedroom Painting Started – Loft Week 10

This week the ensuite was almost finished, with the toilet installed, shower head and door fitted. Started painting the bedroom, and the bedroom door installed. The landing cupboard boarded out too. Electric point inside the cupboard for the powered TV aerial splitter / booster.

landing cupboard boarded out toilet installed shower head and door fitted bedroom plastered bedroom door installed


More like this in the Loft Conversion section

Leave a Reply

Your email address will not be published. Required fields are marked *