Outer Block Walls Started Today – Bungalow – Day 9

I got home from work today and was pleased to see the walls coming along so quickly. The outer block walls have come a long way today. Wall ties in place, ready for the inner wall too. Can now see the position of the kitchen window and the back door and two sets of French doors also taking shape. Very happy with the quality of the work these builders are doing – and my visitors are happy too, as I keep getting asked for their contact details!

Kitchen wall with opening for back door


Kitchen wall with opening for back door

Staifix Wall ties!

Staifix Stainless Steel Wall ties!

Kitchen wall from rear

Kitchen wall from rear

Side path filled with hardcore

Side path filled with hardcore – I’ll make a gravel path here

New wall fixed to old with  wall starter kit

New wall fixed to old with wall starter kit

View through the French doors from the sofa

View through the French doors from the sofa

View from the kitchen table through the smaller French doors

Full length of the kitchen diner

Full length of the kitchen diner, where the treadmill will be

More like this in the Bungalow Extension section

Leave a Reply

Your email address will not be published. Required fields are marked *