
Concrete was pumped in from the road about 20m away from the trench. It is a very smooth concrete. The drainage pipes were left clear for replacement next week.
Not much to report today really. Building inspector is happy with the trenches, builders looked at the drainage and advised some of the old clay pipes are cracked, so they will replace all – there has been some leakage, but not a huge amount. The latest trench dug shows the original foundation of the house,…