Day 28: Electric Sockets Added, Lights Installed, Floor Insulation

Monday 19th August 2013

Today the electric sockets were all put on and the outside lights and ceiling lights fitted. The floor was covered in a waterproof membrane and then Celotex insulation, which was taped up. Now ready for screeding. The radiator was installed and some of the gutters fixed.


Tomorrow the radiator needs to be connected, doors added and gutter finished. Think we are almost there….

2013-08-19 17.31.06

Don’t worry, that hose was a temporary water source for the building, removed afterwards by my plumber.

2013-08-19 17.31.46

The plumbing on this radiator was all changed, it is not hidden behind the radiator.

2013-08-19 17.31.22 2013-08-19 17.31.33 2013-08-19 17.33.21 2013-08-19 17.34.04 2013-08-19 17.36.17 2013-08-19 17.37.37 2013-08-19 17.37.46 2013-08-19 17.38.03 2013-08-19 17.39.40

 