Wednesday 11th September
A day of holes.
Today the builders were outside digging a trench for the sink and dishwasher drainage while an electrician installed new cables for the kitchen.
BT cables will run above the drainage
Where the waste will go after leaving the kitchen
Holes for the electrics
More holes
Holes
Bigger hole showing the radiator pipes too
Some sockets
Dishwasher socket and isolator switch (currently sealed)
Isolator switch for the extractor to go here,
Another view of the electric and water cables
A builder’s radio