Today the drainage was completed. It was a little tight as the new drainage pipe went over the gas and electric cables and then under over a toilet pipe. The windows were also finished off, white sealant added all around the outside. Also same stuff added where the fascia board meets the brickwork.


Drainage hole. One of the left inlets was blanked off, so now used for the kitchen sink.

Drainage hole. One of the left inlets was blanked off, so now used for the kitchen sink.

New pipe going over the toilet inlet, then down. Flow was tested, all good.

New pipe going over the toilet inlet, then down. Flow was tested, all good.

Inspection cover on front path

Inspection cover on front path

Fresh asphalt on the drive. Hopefully it will blend a little once the drive is steam cleaned.

Fresh asphalt on the drive. Hopefully it will blend a little once the drive is steam cleaned.