Re-routing rainwater drainage pipes for extension work

Day 7: Drainage Pipes Re-routed and First Bricks Laid

We were away again, but got back in the afternoon. The rainwater drainage pipe was re-routed to run alongside the new part of the building and to meet with the other pipe before heading off under the lawn.

The first of the bricks had been laid today too. The skip man and the materials people were both late in delivering.


First layer of bricks added.

First layer of bricks added.

2013-07-23 17.13.03 2013-07-23 17.13.07

Materials

Materials

Where the mortar is placed for the bricklayer

Where the mortar is placed for the bricklayer

2013-07-23 18.33.25

Still not reached the bottom visible layer

Still not reached the bottom visible layer

 