After the builders left on Day 13 I positioned bricks to mark the corners of the 2 sofas and the TV (a shovel) and TV stand / speakers (the red supports). The bricks on the door mark the actual door position (1.6m wide). It is important to layout a room as the build commences as…
House Extension
Cavity wall insulation added between bricks and blocks
by Jon •
Day 13: First Cavity Wall Insulation Placed The walls flew up today. Starting to get a real feel of how the room will be. Discussed radiators and flooring, as well as the all important audio cable conduit. The cavity wall insulation was placed while the walls there bricked up. The order is external bricks, insulation…
Can you build in heavy rain?
by Jon •
Making the opening for the patio door
by Jon •
Brick laying the first walls on the extension
by Jon •
Installing suspended block and beam floor on a damp proof course layer
by Jon •
Day 9: Damp Course and Suspended Block and Beam Floor Laid Today most of the suspended block and beam floor was put in. They needed an extra beam so could not complete today. They followed engineering specification for the size of the room but felt that there was too much movement so after consulting with…
Building the cavity wall and installing air bricks
by Jon •
Day 8: Cavity Walls Started, Air Bricks Added We were out all day and got back to see 2 walls forming, the internal and external. These are the walls that will eventually be hidden below ground level. It is interesting to see how they use different bricks (cheaper ones) at the bottom and nicer looking…