This week the floorboards started to go down, and the radiator plumbing was installed – you can see the pipes in the downstairs bedroom stud wall. I could now easily walk around and get a better look at everything! The floorboards were chipboard flooring, which provides a light weight strong floor for a loft. They did squeak a bit though! The first of the insulation was also installed.