The highlight of week 9 was the shower was built, which included to inlet shelves for storing shower gels etc. The tiling was also done (all laser guided for perfect lines), and I painted the office. The stairs were plasterboarded.
The highlight of week 9 was the shower was built, which included to inlet shelves for storing shower gels etc. The tiling was also done (all laser guided for perfect lines), and I painted the office. The stairs were plasterboarded.
More like this in the Loft Conversion section